What are the lead times for ordering propellers?

Every order is unique, from requirements to location. As a rough guide here’s an example of lead times:

  • Standard UAV/UAM propellers: Ready-to-ship with short lead times.
  • Bespoke blade design: Typically 3-4 weeks for CFD simulation, 5-7 weeks for full design and CAD modelling.
  • High-volume orders: Scaled production schedules based on demand.